This was a double storey extension to a hospital carried out on behalf of RG Carter. We carried out both the Carpentry and Drylining/Plastering packages. Carpentry consisted of the timber roof and all the internal carpentry items. The Drylining consisted of dot and dab walls, stud walls, both MF and Grid ceilings. 95% of the plastering was 2 coat plaster. This project was delivered on program and to the highest standard.